KS KlipFix39

Product Information

KS KlipFix39 is the Concealed-fixed Roof System, (boltless system) – clip is fixed to the purlin before the sheet is located over clip. So, the fastener doesn’t pass through the sheet. Can be rolled-form on-site for long length roof without end lap or custom length as required. To increase roof drainage and waterproof, anti-leakage, suitable for roofing, walling and ceiling.

  • Profile dimension : Cover width 700/ Rib height 39 mm
  • Base metal Thickness (BMT) : 0.42, 0.45, 0.48, 0.55, 0.60 mm
  • Zincalume (TCT) : 0.47, 0.50, 0.53, 0.60, 0.65 mm
  • Strength of Steel : G550 Mpa (Min Yield strength 550 MPa)
  • Coating : Zincalume and Colorbond steel
  • Recommend min. roof slope : 2°
  • Application : Straight, Curve, Roofing, Walling, Ceiling
  • Method of installation : Boltless system (concealed-fixing)

Recommend for new clip “Clip-X-Fix”. There are 8 Highlights for good value and save cost.

  1. 20% cheaper than the previous clip.
  2. 20% faster installation to save cost
  3. Save cost by reducing the Steel End Closer at the end of the sheet
  4. Easier to install because have base alignment
  5. Accurately installation with Stopper
  6. Stronger, fully lock the sheet with the new clip with a specific design
  7. Beautiful by reducing the little wave of sheet (Oilcanning)
  8. Can be used with KS KlipFix39 and general boltless roof in the name “Kliplok”

Please download brochure or contact us for more information

Installation Method with “New Clip-X-Fix” clips

1. Fix the row of ‘new Clip-X-fix’ clips to all purlin

2. Fix first sheet over the fixed clips and locked in position

3. Place the next sheet over its clips properly. Check alignment.

4. Place the next sheet until complete.

Installation Method with “Clip-X-Line” clips

1. Fix the row of ‘Clip-X-Line’ clips to all purlin

2. Fix first sheet over the fixed clips and locked in position

3. Place the next sheet over its clips properly. Check alignment. Turn up the tray of sheet at the ridge of roofing.

4. Place the next sheet until complete.

Installation Method with "Clip Tower" clips

1. Fix the first row of clips to all purlin for the first sheet

2. Fix first sheet over the fixed clips and locked in position

3. Fix the clips engaged over the rip of the installed sheet

4. Place the next sheet over its clips. Check alignment. Turn up the tray of sheet at the ridge of roofing